Wigan to Bolton (W2B)

Andromeda Engineering are excited to be supporting Atkins on the production of the overhead line GRIP 4 outline design on the Wigan to Bolton (W2B) infill electrification scheme.

Company News / September 23rd, 2022

Wigan to Bolton (W2B)

Andromeda Engineering are excited to be supporting Atkins on the production of the overhead line GRIP 4 outline design on the Wigan to Bolton (W2B) infill electrification scheme.